pavilion construction

project name: boulder dash

pavilion construction project during the 3rd year of school. 

pavilion was constructed on a leveled, cnc milled wood frame base. pavilion was constructed with water jet cut steel sheets, each piece was then assembled together with hex bolts and nuts. the interior was painted fuchsia,